JSC "Teleradiocom" » projects » 4. The reconstruction project
Main Контакты

Navigation

Popular

Calendar

«    August 2017    »
MoTuWeThFrSaSu
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
 
JSC "Teleradiocom" » projects » 4. The reconstruction project

4. The reconstruction project

14-04-2014, 16:00 | Category: projects | Views: 607
The reconstruction project

Provides for quality control of radio stations broadcasts of "Teleradiocom."
The reconstruction project the CRA (communication-distribution hardware) provides for quality control of radio stations broadcasts of "Teleradiocom."
This time the equipment is placed in the KRA Head of OAO "Teleradiocom", but due to the failure of the cable radio center 1, 5 radio center, perversity cable home quality radio broadcasting has become defective.
To improve this department conducted the following:
- Equipment of the shop is completely replaced by modern computer equipment.
- CRA will join with the House Radio and TV "Safina" TV "Dzhahonnamo" and TV "Bakhoriston."
- To connect to the CRA with radio stations 1 and 5 radio center was built microwave relay.

 

JSC "Teleradiocom" » projects » 4. The reconstruction project